Latest
Peabody walk
under construction
Barcoding
under construction
Archive
Please reload

April 21, 2016

We can't wait to see the final result at the Helicopter Factory in Washington DC!

Currently under construction, this 28,000 square foot site will be transformed from a surface parking lot into six lofty row houses with a total of 15 units.

Two sizable units will be infilled into the existing historic warehouses in the rear of the development. The whole development will be tied together with a central courtyard and residential parking, 

 

Check out more information about the development in partnership with Brick Lane Real Estate and Brook Rose Development,

April 15, 2016

 We were fortunate to see the amazing Richard Niessen speak about his "Palace of Typographic Masonry" last night at the Maryland Institute College of Art. His graphic work takes tangible three-dimensional objects and layers their forms into stunning screen prints.

 

Check out some of his work!

 

April 13, 2016

 Construction is wrapping up at the historic Central Savings Bank in the heart of Downtown Baltimore. Urban Design Group is proud to have worked with Poverni Sheikh Group in transforming this long vacant building into a vibrant mixed-use space. Our mission was to maintain the historic nature of the site while also providing modern amenities for all commercial and residential tenants. 

 

The upper floors will become 24 apartments, ranging from studios to two-bedroom units. The ground floor has been fitted out for David and Dad's restaurant and CorCycle Studio.

 

 

Please reload

  • Facebook Clean Grey
  • Twitter Clean Grey
  • LinkedIn Clean Grey

© 2016 Urban Design Group